Hetauda Precast Rail Sleepers & Infrastructure
Commercial Terms & Sourcing
Standard sample development fee applies, 100% credited against qualifying production order.
30% Advance payment with order confirmation, 70% balance prior to factory dispatch against commercial invoice.
Machinery & Infrastructure
Heavy pre-stressing bed with automatic hydraulic tensioning system, twin-shaft concrete batching plant (60 m3/hr), immersion high-frequency vibrators, steam cure canopy with thermostatic controllers, magnetic particle crack inspection unit for rail inserts.
27.4430°N, 85.0430°E
Source:
Plant Floor Contacts
Ramesh Gautam (Technical Head)
Plant Owner / Managing DirectorHID Main Access Road, Sector C, Hetauda
Makwanpur District, Hetauda Hub
Sajedar Verification & Quality Audit Assessment
Independent audit validating legitimate physical production lines vs commission brokers.
Central precast infrastructure hub fabricating high-specification tunnel sleepers and platform copings for national railway expansion corridors.