Koshi Pre-Stressed Concrete Sleepers & Track Works
Commercial Terms & Sourcing
Standard sample development fee applies, 100% credited against qualifying production order.
30% Advance payment with order confirmation, 70% balance prior to factory dispatch against commercial invoice.
Machinery & Infrastructure
Pre-stressed concrete long-line bed casting system, automated 3x3mm wire payoff and feeding car, pneumatic concrete spreader with travelling hopper, steam curing tunnel with boiler plant, hydraulic sleeper load test bench, ultrasonic pulse velocity concrete tester.
26.5970°N, 87.3060°E
Source:
Plant Floor Contacts
Binod Kumar Rathi (General Manager)
Plant Owner / Managing DirectorBiratnagar-Dharan Highway, Sonapur Sector, Duhabi
Sunsari District, Biratnagar Corridor
Sajedar Verification & Quality Audit Assessment
Independent audit validating legitimate physical production lines vs commission brokers.
Eastern transport corridor precast facility manufacturing high-durability concrete sleepers and signalling troughs for the Bathnaha-Biratnagar cargo rail line.