Narayani Boilers and Heavy Engineering Works
Commercial Terms & Sourcing
Standard sample development fee applies, 100% credited against qualifying production order.
30% Advance payment with order confirmation, 70% balance prior to factory dispatch against commercial invoice.
Machinery & Infrastructure
Heavy 4-roll hydraulic plate bending machine (up to 45mm plate thickness), submerged arc welding (SAW) automatic column and boom rig, plasma CNC plate profile cutter, post-weld heat treatment (PWHT) furnace, and digital radiographic X-ray weld inspection testing
27.1462°N, 84.9381°E
Source:
Plant Floor Contacts
Er. Manoj Kumar Kalwar
Plant Owner / Managing DirectorPipara Industrial Strip, Simara Bypass, Jeetpur Simara
Bara District, Birgunj Corridor
Sajedar Verification & Quality Audit Assessment
Independent audit validating legitimate physical production lines vs commission brokers.
Premier industrial boiler and heavy vessel fabrication plant along the Birgunj-Simara corridor, manufacturing certified biomass steam boilers and petroleum storage tanks.